Another pic of lift hill construction. Once completed, lift chain testing will commence. There will be multiple times of supports being built and broke down to insure quality of track is being built and support integrity is not compromised. Pic construction will be updated.
Image META information
COMPUTED.UserCommentEncoding
ASCII
COMPUTED.Thumbnail.Height
376
COMPUTED.Thumbnail.Width
504
IFD0.ImageWidth
4032
IFD0.ImageLength
3024
IFD0.GPS_IFD_Pointer
5964
THUMBNAIL.ImageWidth
504
THUMBNAIL.ImageLength
376
EXIF.ShutterSpeedValue
5906/1000
EXIF.ApertureValue
153/100
EXIF.BrightnessValue
263/100
EXIF.FocalLengthIn35mmFilm
26
EXIF.ImageUniqueID
F12QSJA00SM F12QSKB01SB
File Name
gallery_4228_1099_2239864.jpg
Unix Timestamp
1625161610
Original File Size
4704121
File Type
2
Mime Type
image/jpeg
Sections Found
ANY_TAG, IFD0, THUMBNAIL, EXIF, GPS, INTEROP
HTML Sizes
width="4032" height="3024"
Image Height
3024
Image Width
4032
Color
TRUE
Byte Order Motorola
FALSE
Aperture F-Number
f/1.7
Thumbnail File Type
2
Thumbnail Mime Type
image/jpeg
Camera Make
samsung
Camera Model
SM-G950U
Orientation
The 0th row is the visual right-hand side of the image, and the 0th column is the visual top
X-Resolution
72/1
Y-Resolution
72/1
Resolution Unit
2
Software
G950USQU8DUD3
Date Taken
2021:07:01 08:50:51
YCbCr Positioning
centered
Thumbnail Compression
JPEG Compression
Thumbnail Orientation
The 0th row is the visual right-hand side of the image, and the 0th column is the visual top