Jump to content




Batwing


  • Please log in to reply
69 replies to this topic

#41 SSCoasters

SSCoasters

    Architect

  • 342 posts

Posted 17 February 2003 - 05:10 PM

You apply it to the axles because if you just apply it to the track it wont lat long and you'll have to keep wiping it down.


#42 Funky21

Funky21

    Entry Engineer

  • 713 posts

Posted 17 February 2003 - 05:18 PM

B) B) Thats what I meant, after you put it on the axels you can put it on the track B)

SSCoasters Moderator
The SSCoasters Forum Rules

[SIGPIC][/SIGPIC]

Purdue Alumni - BS in Construction Engineering, MBA

#43 GregM

GregM

    Architect

  • 367 posts

Posted 17 February 2003 - 05:51 PM

Thanks for the tips! I think I'll just try applying it to the axles if it needs it. Applying to the track sounds like a little more of a mess than what I want to deal with. Of course, I've yet to reach the stage of construction in my model where I know whether I'll need to lubricate the trains at all! But, I'm not far from that point now. B)

Coming Eventually:Something... Really... Big...
Now viewable in the Screamin' Serpent gallery:
Race Thru The Clouds!(defunct)
Crazy Comet(defunct)

#44 coasterfreak11

coasterfreak11

    Lead Engineer

  • 1892 posts

Posted 17 February 2003 - 05:54 PM

ya cuz i did it to the axels and it makes the wheels slick and the track too!!


#45 GregM

GregM

    Architect

  • 367 posts

Posted 17 February 2003 - 07:01 PM

Sounds awesome, coasterfreak. I do hope you will try your batwing element again some time since that was really cool looking. B)

Coming Eventually:Something... Really... Big...
Now viewable in the Screamin' Serpent gallery:
Race Thru The Clouds!(defunct)
Crazy Comet(defunct)

#46 coasterfreak11

coasterfreak11

    Lead Engineer

  • 1892 posts

Posted 17 February 2003 - 07:26 PM

i will! i am now over half way finished w/ my new coaster that MIGHT be named chaos and i need to build another lift hill prolly 4 ft tall and then i will make it go into a batwing, banked turn, inline twist down a drop and another inversion (cant tell yet) and hopefully it will have enough speed to make it through a millenium force banked turn! :rolleyes:


#47 Funky21

Funky21

    Entry Engineer

  • 713 posts

Posted 17 February 2003 - 11:07 PM

Can't wait, hope you finish soon B)

SSCoasters Moderator
The SSCoasters Forum Rules

[SIGPIC][/SIGPIC]

Purdue Alumni - BS in Construction Engineering, MBA

#48 coasterfreak11

coasterfreak11

    Lead Engineer

  • 1892 posts

Posted 17 February 2003 - 11:29 PM

i am VERY close to being finished w/ the lift hill and i will be working on the batwing soon! so far its DEFINITELY my fav. model i have ever built!


#49 coasterfreak11

coasterfreak11

    Lead Engineer

  • 1892 posts

Posted 18 February 2003 - 10:42 AM

i finished the lift hill and tonite i will finish the batwing! then i hope i have enough speed for a vertical loop and an inline twist(im still at school!)


#50 Funky21

Funky21

    Entry Engineer

  • 713 posts

Posted 18 February 2003 - 05:10 PM

Remember to grease up the wheels and track B)

SSCoasters Moderator
The SSCoasters Forum Rules

[SIGPIC][/SIGPIC]

Purdue Alumni - BS in Construction Engineering, MBA

#51 coasterfreak11

coasterfreak11

    Lead Engineer

  • 1892 posts

Posted 18 February 2003 - 05:41 PM

all right i will and thanks A LOT that helps me SO much cuz otherwise i would still be stuck on the rest of the model!


#52 Funky21

Funky21

    Entry Engineer

  • 713 posts

Posted 18 February 2003 - 08:06 PM

B) Yeah well it works great, thats all I have to say B)

SSCoasters Moderator
The SSCoasters Forum Rules

[SIGPIC][/SIGPIC]

Purdue Alumni - BS in Construction Engineering, MBA

#53 coasterfreak11

coasterfreak11

    Lead Engineer

  • 1892 posts

Posted 18 February 2003 - 08:32 PM

ya now i am halfway finished w/ the batwing and i am running out of pieces!!!! and i dont want to destruct my top thrill dragster model cuz it is not even 2 weeks old! does anyone know where i can find one RIGHT now for lees than 35? i sure hope so cuz i have looked at most websites and they are going for 60 or higher? i also checked on ebay which is where i will prolly get it.


#54 Funky21

Funky21

    Entry Engineer

  • 713 posts

Posted 18 February 2003 - 09:57 PM

Why not just tear down TTD, mine was up for a week and than down it went and up went Mr. Freeze for another week and now my 4D is being built B)

SSCoasters Moderator
The SSCoasters Forum Rules

[SIGPIC][/SIGPIC]

Purdue Alumni - BS in Construction Engineering, MBA

#55 coasterfreak11

coasterfreak11

    Lead Engineer

  • 1892 posts

Posted 18 February 2003 - 11:39 PM

wow do you have any pics of those models???
i would like to c ur top thrill dragster. mine should be up either tonite or tomorrow.


#56 Funky21

Funky21

    Entry Engineer

  • 713 posts

Posted 19 February 2003 - 05:22 PM

I've already explained what happened to the pics in another topic B)

SSCoasters Moderator
The SSCoasters Forum Rules

[SIGPIC][/SIGPIC]

Purdue Alumni - BS in Construction Engineering, MBA

#57 coasterfreak11

coasterfreak11

    Lead Engineer

  • 1892 posts

Posted 19 February 2003 - 05:58 PM

ya i read that after i put that reply up. sorry but that REALLY stinks!


#58 Funky21

Funky21

    Entry Engineer

  • 713 posts

Posted 19 February 2003 - 06:03 PM

Yeah it really bites because my TTD was like the best B)

SSCoasters Moderator
The SSCoasters Forum Rules

[SIGPIC][/SIGPIC]

Purdue Alumni - BS in Construction Engineering, MBA

#59 coasterfreak11

coasterfreak11

    Lead Engineer

  • 1892 posts

Posted 20 February 2003 - 08:08 PM

I FINISHED MY BATWING AND IT WORKS!!!! THANK THE LORD I WORKED ON THAT THING FOR A WHILE!


#60 Funky21

Funky21

    Entry Engineer

  • 713 posts

Posted 20 February 2003 - 08:28 PM

Cool, can't wait to see the final coaster B)

SSCoasters Moderator
The SSCoasters Forum Rules

[SIGPIC][/SIGPIC]

Purdue Alumni - BS in Construction Engineering, MBA